top of page
West Trunk (1).jpg

West Trunk Sanitary

Sewer Rehabilitation

The West Trunk Sanitary Sewer Rehabilitation is one of the largest and most complex trenchless engineering undertakings in North American history. Serving Peel Region’s rapidly growing population, this critical wastewater lifeline required a complete structural restoration to combat severe biogenic hydrogen-sulfide gas corrosion. As the specialty rehabilitation contractor, Tarpon Contracting successfully executed the internal structural wrapping of this massive asset, restoring its structural integrity and extending its operational lifespan by decades without surface disruption.

West Trunk (1).jpg

West Trunk Sanitary

Sewer Rehabilitation

The West Trunk Sanitary Sewer Rehabilitation is one of the largest and most complex trenchless engineering undertakings in North American history. Serving Peel Region’s rapidly growing population, this critical wastewater lifeline required a complete structural restoration to combat severe biogenic hydrogen-sulfide gas corrosion. As the specialty rehabilitation contractor, Tarpon Contracting successfully executed the internal structural wrapping of this massive asset, restoring its structural integrity and extending its operational lifespan by decades without surface disruption.

West Trunk Sanitary Sewer Rehabilitation

Client: Region of Peel

Project Timeline: October 2021 to March 2026.

Project Specifications:

  • Location: Peel Region (Mississauga / Brampton), Ontario

  • Asset Size: 2,400 mm (2.4-meter) diameter concrete pipeline

  • Asset Length: Approximately 7 kilometers

  • Methodology: Advanced Trenchless Internal Rehabilitation / Concrete Protective Lining (CPL)

Tarpon Contracting’s Core Contributions:

Tarpon Contracting served as the hands-on execution team inside the pipe, transforming aging concrete into a high-durability, corrosion-resistant asset. Our specialized teams managed:

  • Precision Substrate Preparation: Executed high-pressure cleaning and structural prep to ensure optimal bonding on the decades-old concrete surface.

  • Carbon Fiber Structural Wrapping: Applied TCI CarbonStrong 850 structural carbon fiber wrap from the inside out, effectively creating a "pipe within a pipe" to restore full load-bearing strength.

  • Advanced Corrosion Barrier Application: Sprayed the final TCI ShieldStrong 955-G protective liner and ProTecStrong epoxies to seal the inner structure permanently against biogenic corrosion.

  • Confined Space & Flow Management Execution: Safely navigated high-risk, deep-tunnel confined spaces while maintaining strict coordination with regional flow-diversion schedules.

Regional Significance & Impact:

The West Trunk Sewer is the backbone of Peel Region’s wastewater network. Tarpon’s work on this asset carried immense regional significance:

  • Enabling a $350M Network Master Plan: Our internal rehabilitation allowed Peel Region to safely interface this line with the new East-to-West Regional Sewer Diversion, creating a fully balanced network between the Clarkson and G.E. Booth treatment facilities.

  • Zero-Disruption Infrastructure Upgrades: By utilizing advanced trenchless CPL techniques, Tarpon eliminated the need for massive open-cut excavation, saving millions in detour costs and protecting local Mississauga traffic and environment.

All Infrastructure Projects
Tarpon Logo  - Transparent (1).png

Address

35-4120 Ridgeway Dr,

Mississauga, ON, L5L 5S9

Contact

Careers

Interested in joining the Tarpon Team?

Email us your resume.

  • LinkedIn

© 2024 Tarpon Contracting

PRIVACY POLICY

bottom of page